We had been watching many B2B toy buyers waste time or face shipment delays simply because they don’t know what documents to request or how to verify them.
To help global buyers save time and stay fully in control, Chengjitoy, a top toy supplier, summarizes a clear seven-stage timeline for toy procurement — from Inquiry to Sample, Production, Inspection, Shipment, Customs Clearance, and Receiving.

Follow this step-by-step checklist and you’ll avoid confusion, mismatched data, and unnecessary back-and-forth communication.
Stage 1: Inquiry & Quotation (3–5 Days)
Put every detail on paper — avoid verbal misunderstandings.
During the inquiry, confirm all product and order details clearly in writing:
- Product type (e.g., plush dinosaur / plastic puzzle)
- Function (e.g, with or without music)
- Color (Pantone code provided)
- Packaging (color box/carry bag)
- Quantity and price target
- Two key points:
① Safety standard (EN 71 / CPSIA)
② Customization request (logo embroidery or printing position) - Production lead time (normally 7–10 working days)
- Shipping method (sea/air)
Documents Required
| Type | File Name | Key Information |
| Basic | Buyer Requirement Form | Notes materials (e.g., polyester plush), tolerance ±0.5 cm, safety qualification. |
| Basic | Product Specification Sheet | Notes materials (e.g. polyester plush), tolerance ±0.5 cm, safety qualification. |
| Core | Initial Quotation Sheet | States unit / total price, trade term (FOB Shenzhen / CIF Rotterdam), payment term (T/T 30%), production lead time, validity 7 days. |

Stage 2: Sample Confirmation (5–7 Days)
Set the standard — avoid costly rework.
After inquiry confirmation, the first stage of toy procurement, a sample is made according to the requirements.
Check every functional and visual detail before approving mass production:
- Function (e.g., musical toy sounds normal)
- Design accuracy (e.g., embroidery or printing)
- Color matches Pantone card
- Size confirmed by caliper
Documents Required
| Type | File Name | Key Information |
| Basic | Sample Tag | Shows actual measurements and test results (e.g., “Sound normal, no noise”). |
| Basic | Sample Test Record | Shows actual measurements and test results (e.g. “Sound normal, no noise”). |
| Core | Sample Approval Form | Lists sample ID (e.g., SY-202405), order number, and date. |

Stage 3: Production (7–10 Working Days)
Track progress — control the timeline of the whole toy procurement process.
After sample confirmation, production begins based on a defined schedule.
Weekly updates should include:
- Day 3 – raw materials arrived
- Day 5 – semi-finished stage
- Day 10 – final assembly
Documents Required
| Type | File Name | Key Information |
| Basic | Production Progress Tracker | Lists the date, progress node, and the responsible person. Mark’s key points like “Material Arrival / Half Production / Completion.” |
| Basic | Material Inspection Report | Lists date, progress node, and the responsible person. Mark’s key points like “Material Arrival / Half Production / Completion.” |
| Core | Production Order Confirmation | Includes test results (e.g., EN 71 compliance). |

Stage 4: Quality Inspection (2–3 Days)
Three-step QC ensures trustworthy delivery.
Inspections should cover three stages:
- Initial QC – raw materials & semi-finished items (no burrs or defects).
- Mid QC – random check during production (function, color, packaging).
- Final QC – full inspection of finished goods (packaging & quantity).
Documents Required
| Type | File Name | Key Information |
| Basic | Initial / Mid / Final QC Record Sheets | Each includes time, inspector, qualified qty, and problem description (e.g., “10 boxes creased cartons”). |
| Core | Final Inspection Report | Each includes time, inspector, qualified quantity, and problem description (e.g., “10 boxes creased cartons”). |

Stage 5: Loading & Shipment (1–2 Days)
Supervise loading — ensure the safety and accuracy of the toy procurement on the whole.
During loading, record container and seal numbers, and video the entire process (from empty container → loading → sealing).
Documents Required
| Type | File Name | Key Information |
| Basic | Loading List | Container No., each carton model/qty/gross weight, and total carton count. |
| Core | Bill of Lading (Draft) | Must match consignee, destination port, cargo description, and container No. |

Stage 6: Customs Clearance (3–7 Days, depending on destination)
Keep documents consistent for smooth release.
Chengjitoy prepares a complete customs file package for buyers during the toy procurement, ensuring that all information matches across the invoice, packing list, and bill of lading.
Documents Required
| Type | File Name | Key Information |
| Basic | Commercial Invoice & Packing List | Include HS code (9503…), unit/total amount in both figures and words, and carton dimensions (L×W×H). |
| Core | Toy Safety Certificate (EN 71 / CPSIA) / Certificate of Origin / B/L Original or Telex Release | Issued by third-party lab (e.g., SGS / Intertek); must show product model and standard. Origin Certificate for duty reduction, if applicable. |

Stage 7: Receiving & Completion (1–2 Days)
Verify everything upon arrival to close the loop.
This is the final stage of the whole toy procurement process, but when goods arrive, the buyer should check:
- Quantity matches order
- Packaging intact (no damage)
- The product functions the same as the approved sample
Documents Required
| Type | File Name | Key Information |
| Basic | Receiving Checklist | Columns for Order Qty – Received Qty – Difference – Result. |
| Core | Receiving Confirmation Form | Signed once verified; attach photos of any issue and agreement record. |

✅ Chengjitoy’s One-Stop Support
Throughout the entire timeline of toy procurement, Chengjitoy ensures full transparency and efficient coordination for each buyer:
- Weekly updates with photos and videos.
- Pre-shipment document review (invoices, packing lists, B/L).
- Templates for forms like “Buyer Requirement Form” and “Sample Approval Sheet.”
- 24-hour response for any after-sales or delivery issues.
Contact Chengjitoy
www.chengjitoy.com
[email protected] 📞 +86-137-1596-6567










